Engineering challenge
Project context and technical challenge
Integrating prestressed-concrete straight spans and reinforced-concrete box-girder loops within a complex urban traffic interchange.
3.1 km urban overpass project incorporating prestressed-concrete and reinforced-concrete box-girder systems.
← Back to portfolio
This information distinguishes the overall project context from my individual engineering role.
Integrating prestressed-concrete straight spans and reinforced-concrete box-girder loops within a complex urban traffic interchange.
Structural design and analysis contribution, including prestressed and RCC box-girder systems and loop configurations.
Project information describes the overall project context. The “My Contribution” section identifies the engineering work performed by Dr. Moniruzzaman Moni as part of the identified employer or project team.