Transportation · Completed

Kazir Bazar Bridge

Bridge over the Surma River in Sylhet incorporating 35 m and 50 m prestressed-concrete girder spans.

← Back to portfolio
Kazir Bazar Bridge
Engineering challenge

Project context and technical challenge

Designing long-span prestressed girders and deep foundations for a major river crossing.

My contribution

Structural engineering role

Designed PC girders, deck slab, abutment walls, piers, pier caps, bored piles and pile caps; prepared cost estimate and coordinated with contractors.

35 m girders50 m girdersBored pilesSylhet
Project highlights

Representative technical scope.

0135 m girders
0250 m girders
03Bored piles
04Sylhet